The 2-Minute Rule for Bunkering Companies
The assigned oiler will aid the 3rd Engineer on obligation. He will just take soundings each ten minutes and check the overall conditions across the deck for protection. In the meantime, the other oiler assigned will continuously Handle and inspect the manifold region with common studies on stress.1. The chief engineer must determine and Check ou